{"id":3841,"date":"2025-12-23T06:07:08","date_gmt":"2025-12-23T14:07:08","guid":{"rendered":"https:\/\/www.qsenergy.com\/?p=3841"},"modified":"2026-01-22T10:26:22","modified_gmt":"2026-01-22T18:26:22","slug":"qs-energy-positions-aot-3-0-for-full-pipeline-global-deployment","status":"publish","type":"post","link":"https:\/\/www.qsenergy.com\/index.php\/2025\/12\/23\/qs-energy-positions-aot-3-0-for-full-pipeline-global-deployment\/","title":{"rendered":"QS Energy Positions AOT 3.0 for Full\u2011Pipeline, Global Deployment"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p><strong>Shareholder\u2011Backed Investments Drive Commercial Readiness, Temple Partnership, and High\u2011Impact Economics for Customers<\/strong><\/p>\n<p><strong>TOMBALL, TX \/ ACCESS Newswire \/ December 23, 2025<\/strong> \u2013 QS Energy, Inc. (OTC: QSEP) today provides an update on the status of its AOT 3.0 commercialization, manufacturing readiness, and Temple University partnership as the Company advances toward full\u2011pipeline deployment under its previously announced 400\u2011unit framework.<\/p>\n<p><strong>Building a Pipeline\u2011by\u2011Pipeline Commercial Program<\/strong><\/p>\n<p>Throughout 2025, QS Energy has focused on aligning specific AOT units with specific pipelines, countries, and crude owners, mapping each deployment to a defined manufacturing, financing, legal, operational, maintenance, and security schedule. This work is being done in concert with operators and countries who require clear bottom\u2011line outcomes in the form of incremental barrels, throughput\u2011driven cost savings, and carbon credit value in the commitment phase of a 400\u2011unit order.<\/p>\n<p>In practical terms, many of the pipelines under review require on the order of 10 to 15 AOT units per line to achieve meaningful impact; selling one or two units into these systems would not \u201clight up\u201d the full pipeline or deliver sufficient value to the operator and its investors. QS Energy is therefore structuring programs around full\u2011pipeline deployments that are capable of producing durable benefits for customers and their stakeholders, rather than pursuing short\u2011term, partial sales assuming a single AOT unit can provide a pipeline customer a financial benefit, with the goal of helping modernize entire pipeline systems and support broader energy objectives rather than simply providing isolated units. This process is required for the Company\u2019s 400\u2011unit order with value created in a two\u2011year project timeline.<\/p>\n<p><strong>Commercial Readiness and AOT 3.0<\/strong><\/p>\n<p>Over the past year, advances in the AOT 3.0 platform\u2014along with improvements in enabling components, control systems, and manufacturing readiness\u2014have materially strengthened the Company\u2019s ability to deliver business impact at the full pipeline level. A significant portion of the Company\u2019s 2025 efforts and available capital, including support provided through long\u2011standing shareholders, has been invested directly into AOT technology and the supporting manufacturing and test infrastructure.<\/p>\n<p>As a result, the Company views AOT 3.0 as commercially ready: not only does it reduce viscosity and improve flow, it does so at a scale and reliability that can translate into meaningful revenue uplift, cost efficiency, and sustainability benefits for pipeline operators and crude owners. That is the standard by which QS Energy, its customers, and its country partners are judging success going forward.<\/p>\n<p>\u201cOur investors, our customers, and their country partners are all aligned on one simple point: AOT has to move the needle at the full pipeline level,\u201d said Cecil Bond Kyte, Chief Executive Officer of QS Energy. \u201cWith AOT 3.0 and the supporting infrastructure we have put in place, we are now in the strongest commercial position in our history to deliver full\u2011pipeline solutions that create incremental barrels, operating leverage, and carbon benefits for pipeline operators and crude owners.\u201d<\/p>\n<p>In the Quarterly Report on Form 10\u2011Q for the period ending September 30, 2025 filed on November 14th, 2025, QS Energy described its ongoing commercial efforts and the opportunities expected to drive additional AOT orders beyond the initial five\u2011unit order announced on June 20, 2025. Those efforts are being advanced through a disciplined, full pipeline level evaluation with the same counterparties under the previously announced 400\u2011unit framework, using the integrated financial model set out in the Company\u2019s AOT Financial Modeling Guidelines. Together, QS Energy, its customers, and their country partners are using this framework to optimize a common set of variables\u2014number and placement of units along the line, capital cost, manufacturing and installation timelines, expected viscosity\u2011driven energy savings, incremental barrels from higher effective throughput, carbon credit value, and security\u2011related lost\u2011barrel recovery\u2014so that each fully equipped pipeline delivers clear operating leverage and an attractive payback period and net present value for the full pipeline, its owners, and the host country. The purpose of this process is to ensure that follow\u2011on orders under the program are structured as long\u2011term, win\u2011win\u2011win partnerships\u2014aligning QS Energy\u2019s technology and activation capabilities with durable value creation for crude operators and their nations\u2014rather than short\u2011term, transactional sales, in effect moving the relationship from a one\u2011off purchase order to a long\u2011term operating partnership.<\/p>\n<p><strong>Temple University: Enduring Technology Backbone<\/strong><\/p>\n<p>QS Energy\u2019s amended agreements with Temple University, announced earlier this year, mark the latest chapter in a long relationship that has underpinned the Company\u2019s core technology for nearly two decades. The updated framework improves business flexibility while maintaining a shared commitment to ongoing research, protection of intellectual property, and disciplined co\u2011development of future enhancements.<\/p>\n<p>\u201cAs a technology\u2011driven company, our long\u2011term value ultimately depends on the strength and protection of the underlying science, and Temple remains a critical partner in that mission,\u201d added Kyte. \u201cThis renewed framework allows us to advance AOT commercially while ensuring that the technology continues to be supported by rigorous research and a strong IP foundation, so that the benefits we deliver to customers and host countries are sustainable over time.\u201d<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:20px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-bottom:30px;width:100%;\"><div class=\"fusion-separator-border sep-single\" style=\"--awb-height:20px;--awb-amount:20px;border-color:var(--awb-color1);border-top-width:1px;\"><\/div><\/div><div class=\"fusion-text fusion-text-2\"><p><b>Safe Harbor Statement<\/b><\/p>\n<p>Some of the statements in this release may constitute forward-looking statements under federal securities laws. Please click <span style=\"text-decoration: underline;\"><a href=\"https:\/\/www.qsenergy.com\/index.php\/disclaimer\/\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a><\/span> for our complete cautionary forward-looking statement.<\/p>\n<p><b>About Applied Oil Technology <\/b><\/p>\n<p>QS Energy&#8217;s patented <b>A<\/b>pplied <b>O<\/b>il <b>T<\/b>echnology (<b>AOT<\/b>) is a solid-state turn-key system which uses a high volt \/ low amp electric field to reduce crude oil viscosity. <b>AOT<\/b> installs inline on crude oil pipelines, operates unattended without interrupting pipeline flow, with full remote monitoring and control. More information is available online <span style=\"text-decoration: underline;\"><a href=\"https:\/\/qsenergy.com\/index.php\/technology\/\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a><\/span>.<\/p>\n<p><b>About QS Energy<\/b><\/p>\n<p>QS Energy, Inc. (OTCQB: QSEP), develops and markets crude oil flow assurance technologies designed to deliver measurable performance improvements to pipeline operations in the midstream and upstream crude oil markets. More information is available <span style=\"text-decoration: underline;\"><a href=\"https:\/\/www.qsenergy.com\">here<\/a><\/span>.<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3841","post","type-post","status-publish","format-standard","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/posts\/3841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/comments?post=3841"}],"version-history":[{"count":2,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/posts\/3841\/revisions"}],"predecessor-version":[{"id":3843,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/posts\/3841\/revisions\/3843"}],"wp:attachment":[{"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/media?parent=3841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/categories?post=3841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qsenergy.com\/index.php\/wp-json\/wp\/v2\/tags?post=3841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}